Wind generator Ветрогенераторы
Choose necessary power of wind generator:
 

Wind generatorточечные ветрогенераторы

250 - 200.000 KVT
Modern design of wind turbines allows wind energy usage in an economically effective way. Using wind turbines you can not only supply electricity to the grid but solve power shortage for local and island objects of any capacity.

"WindPark Engineering" Co offers the whole range of activities to install wind power projects.

ветрогенераторы с точкамиWind generator

5 - 60 KVT
Wind power station is used as a source of electricity in windy areas (annual wind speed higher than 5 m/s) in most cases. This condition is not necessary for small easy gathering wind power generators. Such generators are capable work effective at areas with annual wind speed 3.5 m/s.

So today small and medium-sized wind power generators attract house owners living aside from the centralized power grid. Comparing diesel and wind diesel units they choose the second one as cost-effective. Wind generator packed up with lattice tower neither occupies a lot of space nor derelicts the landscape, on the contrary it blends with nature adding novelty to the site...

WindPark Engineering

Wind turbines are used in different locations, which are open areas with good wind capacity. Due to the Russian energy policy, wind turbines are cheaper than connection to the existing grids or diesel fuel delivery, which grounds the constantly growing popularity of wind turbines in our country.

Wind turbines allow saving up to 80% of diesel fuel costs in the areas where diesel generators have become the main power suppliers. Therefore, storage and transportation expenses on diesel fuel are saved and the power supply of such projects becomes less dependent on random factors.

Wind generators significantly decrease the costs of energy complex in comparison to traditional energy sources.

Wind generator "Breeze 5000"

Wind turbines manufactured by ZAO “WindPower Company” are operating in Russia, CIS and other distant foreign countries. With its sales map spreading from Zapolyarie to Middle Asia wilderness, this equipment complies with the most severe climate conditions and is operating even at middle and low wind speed.

A lot of attention is paid to monitoring the quality of the manufactured equipment. After assembling stage every wind turbine or wind complex undergoes bench tests at the production site and afterwards are shipped to the Customer. Every sold and assembled turbine is covered by the service support.